Reconstruction of the swimming pool in Zábřeh

We have reconstructed the swimming facility in the town of Zábřeh. The reconstruction was mainly in modernization of the existing outdoor swimming pool and itsĸcomplementing with various attractions.

Reconstruction of the swimming pool in Zábřeh

On 1st September 2016 the reconstruction of the Swimming facility in the town of Zábřeh began. The reconstruction was mainly in modernizing the existing outdoor swimming pool and its complementing with various attractions and the relax area for the visitors of the swimming pool.

We were able to achieve this by dividing the area of the existing 50m pool in two zones – the sporting and relax oneThe sporting part of the pool allows to fully and undisturbingly enjoy swimming in four tracks, the relax zone is then designated for water fun – you will enjoy a multitrack water slide, hydromassage jets, a gargoyle, a water mushroom, or a rocking cave.The slide in the relax zone may in the future be supplemented with a toboggan.

In addition to the surface works, we have of course carried out also an extensive reconstruction of the swimming pool maintenance area – that included modernization

of the chlorine room, or the renovation of pipelines and other tubing. The works included also brand new and comfortable sun terraces.

After the completion of the reconstruction, the total capacity of the water area is 226 persons. The reconstruction went rather smoothly, so already in the next swimming season (2017), the renewed swimming pool could welcome its visitors.
Should you need to renew or modernize your premisesLet us know. We are experienced in the reconstruction of sights as well as utility buildings.

Completed in the year 2017
Reconstructions, extensions

Photogallery

Reconstruction of the swimming pool in ZábřehReconstruction of the swimming pool in ZábřehReconstruction of the swimming pool in ZábřehReconstruction of the swimming pool in ZábřehReconstruction of the swimming pool in ZábřehReconstruction of the swimming pool in ZábřehReconstruction of the swimming pool in ZábřehReconstruction of the swimming pool in ZábřehReconstruction of the swimming pool in Zábřeh

CareerWould you like to work with us?

We are a solely Czech company and building construction is all ouf life. We have a rich expertise, a stable team of experts, and we perform and realize all reconstructions or new constructions always in a precise manner. We finish assignments in short delivery times.

I would like to work with you!

Selected referenceRECONSTRUCTION AND MODIFIED USE OF HALL B100 SLAVIČÍN IN SLAVIČÍN

RECONSTRUCTION AND MODIFIED USE OF HALL B100 SLAVIČÍN IN SLAVIČÍN

Hall B100 is a part of thewell-known complex of halls of the Vlárské Machine-works in Slavičín. In the past the hall served mainly for the production of metal components for weaving and assembly machines. Now, however, more than ten years it had been unused. The…