The implementation was completed in 2015
The facades of the three-story building of Block 1 and of Block 2, which is taller by three stories, as well as the facades of the six remaining blocks were insulated with the isolation made from the expanded polystyrene and from fire-proof panels with mineral wool, which are resistant to humidity and to changes of temperature. The plinths were insulated with the extruded polystyrene, among the properties of which belong greater solidness, mechanical durability, and a lower probability of moisture absorption.
In the case of the flat roofs of both buildings, the separation glass-fibre vlies were laid on the attics, and the thermo insulation will be ensured by several layers of stabilized polystyrene foam boards. Waterproofing of the roofing was in both cases ensured by the waterproof membrane.
The reconstruction included also window replacement as well as the replacement of lightning rods. All eight buildings were painted in the end. According to the contracting party, the classic white was chosen for the interiors, the facades had been required to maintain the original building looks.
The student dormitories are as new and students will surely remember pleasant memories of their university years.

Our team of experts is here to help. Contact us today to find a solution tailored to your needs. Click the button below to schedule a free consultation!
Contact us